Which software should interior design schools teach?
The trade's 6 professional acts, the matching tools, and how to build a professional-tools module without overloading the curriculum.
Read the articleCost estimation, quotes and fees on the pro side. Budget, tradespeople and pitfalls to avoid on the client side. Written by a practicing interior designer.
The same template sent to at least two contractors, line-by-line comparison, a bid analysis report, and a time-stamped client approval before freezing: the method that secures your cost plan, and the legal framework behind it.
Read the full articleThe trade's 6 professional acts, the matching tools, and how to build a professional-tools module without overloading the curriculum.
Read the articleEstimating, tendering, contracting, documenting, invoicing: the curriculum's 5 gaps as seen from the agency, and how schools can close them.
Read the articleTrade packages, work descriptions, units and quantities: an annotated excerpt, and the method for a template contractors fill in without distorting it.
Read the articleThe act that starts every warranty running: the template section by section, the reservations method, and the pitfalls — tacit handover first.
Read the articleAttendees, progress by trade package, decisions, additional works: the 8-section template, a 20-minute drafting method, and the value of the written record.
Read the articleRC pro as the baseline, décennale as soon as your engagement makes you a builder, dommages-ouvrage on the client side: engagement by engagement.
Read the articleKalm, Aglo, Archipad, Houzz Pro, Excel or Nodal: who does what — quotes, tendering, site tracking, mood boards — and how to choose for your profile.
Read the articleUnits, quantities, omissions: three quotes for the same lot describe three different projects. The bid-analysis method, lot by lot.
Read the articleTen-year liability insurance, professional liability, URSSAF vigilance certificate, company registration: what to demand and how to verify it online.
Read the articleA mood board is not a collage: it is the project's first approval. The 5-step method and the right tools to present it.
Read the articleFrom 1 September 2026, every VAT-taxable business must be able to receive an electronic invoice. The real timeline, and the « nothing before 2027 » misreading.
Read the articleThe architects' standard contracts are not yours. AI 1 and AI 2, the mission phases specific to interior design, and the three clauses never to leave vague.
Read the articleYour fees are at 20 %, always. Works can be at 10 %, but you are not the one invoicing them: what that changes for your cost plan.
Read the articleWord of mouth done properly, Instagram, referrers, local Google, platforms: the channels compared cost by cost, the funnel to measure, and the cheapest lever: first-response speed.
Read the articleWeekly visits, site reports within 24 hours, dated photos, planning by trade package and additional works approved as they arise: the complete ritual, and the tools to keep it.
Read the articleFour tool families, their strengths and breaking points, and the criterion that decides: what happens the day the prospect says yes. An honest comparison, table included.
Read the articleSite survey, work packages, quantities, up-to-date reference prices, explicit margins: the complete 6-step method, with 2026 price ranges for the Paris region.
Read the articleScattered enquiries, prospects left waiting, double data entry: the 5 functions of a trade CRM, and why generic CRMs don't fit the meeting → concept → quote → project journey.
Read the article4 phases, 11 steps, and one principle: every transition is validated by proof, approved quote, client validation, filed deliverable. Never by impression.
Read the articlePricing library, versions and change orders, renovation VAT, online approval, white-label: the 6 capabilities to insist on, and how to compare spreadsheets, generic tools and purpose-built software.
Read the articlePercentage of the works, flat fee or hourly rate? The three models, their 2026 ranges, and how to present fees that speak for themselves.
Read the articleFollow-ups, client reporting, quote versions… Coordination isn't inevitable: it's a tooling problem. What a real management tool changes, in concrete terms.
Read the articlePrice per m², financial aid, choosing tradespeople, short-term rentals, taxes… Everything you need to approach a Paris renovation with confidence.
Read the articleUnderestimated budget, the wrong tradesperson, works done in the wrong order… The 7 costliest pitfalls, seen by a practicing interior designer.
Read the article